Jimmys Beach Sand Pump Station

Location

Jimmys Beach, NSW

Client

Midcoast Council

Completed

July 2019

Cost

4.1M

CCB Envico designed and constructed the Sand Transfer Station over a period of approximately 12 months, between July 2018 and July 2019. Starting with a concept design supplied by Mid Coast Council, CCB Envico prepared a detailed design, focusing on minimising capital and operational costs, while delivering a robust final product that will serve the local community for many years. In addition to the design and construction of the plant, CCB Envico also successfully undertook the commissioning and initial operation of the plant, transferring 20,000m3 of sand to Jimmy’s Beach during the winter of 2019. By partnering with sand slurry design specialists and using cutting edge slurry pumping equipment, CCB Envico was able to deliver the project on time and under budget, delivering sand to the beach immediately after a severe erosion event which had exposed the foundations of the adjacent road.