Involved the design, construction, testing, commissioning and proving of an Activated Sludge Plant (ASP) at the Wallan STP. Work includes modifications to the existing influent pump station, inlet screen and lagoons, construction of a 4ML/d ASP, design and construction of 6ML/d tertiary filter and associated site infrastructure. 50% Joint Venture project with Cockram (Now ICON)